Skip to content
EvidenceHelixEvidenceLib · Scientific Encyclopedia
⌘ K

Scientific library

EvidenceLib encyclopediaAll articles A–Z2,835Open textbooks209Open-access articles1,406Cancer study catalog458How it is made

My workspace this browser

Saved pages0Notes & annotations0

Recently viewed

Explore by field

Cancer and Oncology182Genetics and Genomics170Neuroscience185Cardiovascular Medicine180Immunology142Pharmacology173Molecular Biology161Infectious Diseases150Rare and Inherited Diseases181Clinical Research173Anatomy and Physiology613Drugs and Chemicals621Psychiatry and Psychology185Public Health and Nutrition178Diagnostics and Medical Technology125Respiratory Medicine113Digestive System and Liver91Metabolism and Endocrine Disease177Bones, Joints, Muscles and Skin213Kidney, Urology and Women's Health173Eye, Ear, Nose and Throat55
Plans & pricingCompare EvidenceHelix workspace plans
Library›Open textbooks›Implementing early rehabilitation and mobilisation for children in UK paediatric intensive care units: the PERMIT feasibility study›Phase 3: paediatric early rehabilitation and mobilisation during intensive care feasibility study – part 2 process evaluation

Continue where you left off ()

Explore more with EvidenceHelix Workspace

Compare studies, analyze evidence and create research reports with premium tools.

Explore Researcher plans

Implementing early rehabilitation and mobilisation for children in UK paediatric intensive care units: the PERMIT feasibility study · Phase 3: paediatric early rehabilitation and mobilisation during intensive care feasibility study – part 2 process evaluation

Phase 3: paediatric early rehabilitation and mobilisation during intensive care feasibility study – part 2 process evaluation

CC BY 4.0 · National Institute for Health and Care Research · approximately 32 min read

Introduction

Alongside the PERMIT non-randomised implementation feasibility study, we undertook a process evaluation focused on the feasibility and acceptability of ERM and study processes. The implementation evaluation was informed by NPT. NPT identifies factors that promote and inhibit the routine incorporation of complex interventions into everyday practice. It also explains how these interventions work, looking not only at early implementation, but beyond this to the point where an intervention becomes so embedded into routine practice that it ‘disappears’ from view (i.e. it is normalised). (Text adapted from ‘Normalisation process theory: a framework for developing, evaluating and implementing complex interventions’ by Murray et al., under CC BY 4.0 licence http://creativecommons.org/licenses/by/4.0/).87

Study management

The work package was co-led by BRS, JMen and FK. The study management group provided input into protocol, ethics application design and data interpretation. Sati Sahota was trial co-ordinator. JMen led the process evaluation, with methodological expertise by TR. Qualitative analysis was performed by JMen, TR and Natalie Read.

Methods

We undertook a mixed-methods process evaluation across the three PICU sites. Evaluation of the implementation process was conducted through five key components:

  1. The weekly debriefs with PERMIT champions from each of the three PICUs.
  2. Survey of wider PICU healthcare professionals conducted at three time points at each of the three sites throughout the 5-month study period [normalisation measure development (NoMAD) survey – implementation evaluation tool104].
  3. Qualitative feedback from interviews with healthcare professionals from all three PICUs.
  4. Qualitative feedback from interviews with parents from all three PICUs.
  5. Completion rates of the parent-completed questionnaires (to review feasibility and acceptability).

Sampling and recruitment

We invited two groups of health professionals to take part in feasibility and acceptability work: firstly, ERM champions, those people identified, as part of the PERMIT intervention, as leading the implementation of ERM in the unit and secondly PICU multidisciplinary health professionals involved in any aspect of preparing for or delivering ERM across the unit. Each site aimed to recruit 2–5 ERM champions to take part in weekly debrief conversations (20 debriefs per site; n = 60 total). PICU health professionals were invited to take part in a survey at three time points, aiming for 30 in total per site (n = 90) and consenting staff could also volunteer for a qualitative interview aiming for four or five participants per site (n = 12–15). Parents/legal guardians of CYP recruited to receive the PERMIT intervention were also asked about completing optional outcome measurement tools and an interview. This included those who consented for their child to participate in the PERMIT study (aiming for a sample size of 12–15) and those who declined their child’s participation (aiming for one participant per site, n = 3). The study received Health Research Authority approval (ref 21/SC/0127).

Data collection

Weekly debriefs were conducted with ERM champions from each site, either in person or remotely (telephone/video conference). They were recorded in contemporaneous fieldnotes. Qualitative interviews with PICU health professionals and parents were conducted in person or remotely (telephone/video conference/face to face) and were audio-recorded, intelligently transcribed.105 and edited to ensure respondents’ anonymity. Finally, PICU health professionals also completed a brief online survey at three time points (beginning, middle and end of study period).

Debrief conversations, interviews and survey with health professionals focused on exploring implementation progress, determinants and key learning; this happened throughout the study period. Interviews with parents focused on exploring acceptability and feasibility of PERMIT intervention and study processes; this happened towards the end of PICU admission or following PICU discharge (up to 30 days post admission to PICU).

Initial topic guides for debrief and health professionals and parent interviews were designed, drawing on prior literature, experience, NPT71,72 and TFA.73 They evolved during the course of data collection, allowing for tailoring and gradual integration of a variety of follow-up issues and topics. The survey was based on the NoMAD Questionnaire, a 20-item self-report instrument104 (see Appendix 3, Table 41 for NoMAD survey). The survey was distributed by the local PERMIT champion team through internal e-mail lists, and survey participants had the option to consent to be contacted about an interview with a member of the central PERMIT study team. To ensure both the surveys and interviews captured diverse views across the three units, local teams were encouraged to promote the survey widely to promote different professional groups to engage and participate (criterion-based recruitment).106 Although data saturation is aspired to within qualitative research, that is when no new themes are emerging,107 we recognised this would not be achievable within the time scales of this feasibility study.

Data analysis

Notes from the debriefs were imported into NVivo 12 and deductively coded and analysed using a qualitative content analysis approach of systematic coding and categorising.58 Two researchers (JM, NR) independently familiarised themselves with the data and conducted open-coding, utilising NVIVO™ software for data management. Codes were then discussed and organised into higher-order subcategories and categories.59,60 In relevant sections of the paper free-text quotes from respondents are reported to add clarity, staying close to the original meanings and context.61

The interviews were analysed using a thematic analysis approach. This approach was taken because thematic analysis allows for the identification of common threads that extend across an entire interview or set of interviews.108 It also values the detailed and nuanced account of data, particularly emphasising the context.60 Analysis was informed by the work of Braun and Clarke,109 with NVivo™ software used to assist in the organisation and coding of data. The Framework approach was then used to facilitate systematic, rigorous and transparent data management.110,111

The survey data were analysed descriptively. Three questions explored: (1) how familiar ERM felt, (2) if ERM was a ‘normal’ part of work and (3) if it will become a normal part of work – responses were on a scale of 0–10 (e.g. 0 very new up to 10 completely familiar). The remaining 20 questions required a Likert-scale response (strongly disagree, disagree, neutral, agree, strongly disagree). Responses were allocated a score −2 (strongly disagree) to +2 (strongly agree) for interpretation; median scores for each question are presented.

Results

Study participants

We undertook 48 debrief sessions with ERM champions (Table 23). Despite recruiting well to the champion role at each site, the debrief calls were attended consistently by the same people. Debrief attendees included nurses (n = 2), medical representatives (n = 3), physiotherapists (n = 2), OT (n = 1) and clinical research nurses (n = 3).

TABLE 23 Recruitment for the process evaluation study by site and method of data collection
Site 1Site 2Site 3Total
ERM champion debriefsNo. champions22111245
Attended debriefs20/2017/2011/11a48
Attendees at debrief (Mean)3.7212.2
Participant interviewsHealth professionals74213
Parents76114
PICU health professionals surveyHealth professionals473437118

We received survey responses from 118 health professionals across the MDT. The largest response group (66/118; 56%) were registered nurses and overall most had been in PICU 3 years or longer (88/118; 75%) (Table 24).

TABLE 24 NoMAD survey respondent demographics
CategorySite 1N = 47Site 2N = 37Site 3N = 34TotalN = 118
Profession
 Nurse27231666
 Medic144523
 Physiotherapist35715
 Advanced nurse practitioner0404
 OT1034
 SLT0022
 Clinical skills worker1001
 Pharmacist1001
 Research nurse0101
 Speech therapist0011
Years of experience in PICU
 >1 year3137
 1–2 years113923
 3–5 years107926
 6–10 years49720
 11–15 years59317
 >15 years148325

We interviewed 13 health professionals, including medical representatives (n = 4), PICU physiotherapists (n = 3) and one physiotherapist from a different team (provided on-call cover), advanced nurse practitioners (ANP) (n = 2), one OT, one bedside registered nurse and one team leader registered nurse.

In total, 21 parents consented to participate with the optional questionnaires and the interview, with 15 parents interviewed. Of the six who did not participate, two subsequently declined the interview when contacted, one was only in the study for a few hours so did not feel they could offer any insight and the second child had been re-admitted to hospital so parents did not feel able to participate at the time. One child died before discharge from hospital and three parents did not respond when contacted, after a median of three attempts to contact them. One parent was interviewed but then withdrew therefore interviews from 14 parents were included in the analysis. Interviews took place between November and December 2021 and were conducted in a variety of ways, subject to parental preference. Two were conducted face to face at BCH, five took place on Zoom and seven took place over the telephone. The final analysis included mothers (n = 12) and fathers (n = 2). All of the parents had experience of their child having been intubated and mechanically ventilated during their admission to PICU, and 12 were parents of a child admitted as an unplanned admission.

Pre-paediatric early rehabilitation and mobilisation during intensive care context – questions of capacity

The PERMIT study was introduced into three PICU sites. Across all the sites, potential issues around capacity, especially in relation to levels of MDT staffing, as well as priorities, in relation to place of ERM in ongoing care, were present (Table 25). All sites reflected that although ERM was part of care, they ‘didn’t do it actively or in a structured way’ (Site Two: Medic interview). Patients with defined pathways – neurology patients, those classified as ‘long stay’, infants and patients who were elective and had a more predictable recovery – were more likely to receive ERM. Delivery did not often occur ‘early’ and was undertaken inconsistently:

quite limited in terms of what was being done on the unit. There were elements of, I guess, what you could classify as ERM starting to emerge, but I think the timing was definitely at a later point of the child’s stay.

TABLE 25 Conditions within PICU prior to the study introduction
Workforce contextsOrganisational contexts
Bedside nurses Provide 1 : 1 careFocused on ‘essential’ life-saving/sustaining workERM not seen as part of this currentlyUnit bed capacity Dependent on securing sufficient nurses on shift to shift basisAt times no choice to decline patients so a unit can be at >100% capacity
Nursing workforce Many staff vacanciesOn shift-to-shift basis may have reduced staffing and poor skill mixPatient acuity May have appropriate staff:patient ratios for 1 : 1 care, but the patients on the unit are ‘sick’ and have high level of needStaff may have to forgo activities seen as ‘desirable’ to support other staff members
Specialist services (such as SLT, OT) Large waiting lists, long waiting times (even for inpatient on PICU)Culture surrounding ERM ERM often not conducted ‘early’Often seen as physio domainLack of ownership within nursing particularly
MDT Limited resources for full MDT involvement with every PICU patientERM programmes Presence of an ERM programme does not equate to ERM conductAbsence of an ERM programme does not equate to no ERMBoth situations can find a lack of standardisation
ERM funding No funding available for ‘extra’ work required for ERM currently
Additional challenges of 2021 COVID, staff illness, staff isolationReduced parental visiting, no extended family visitors

In addition, it was more likely to occur on weekdays, in office hours, and interventions were likely to be ‘low level’ and often movement-focused. In Site 1, an ERM programme had been launched in 2019, with good leadership and good staff engagement. However, the programme had floundered – with maternity leave, staff turnover and service pressures – and in 2021 there was little awareness of the programme. The champions felt that the feasibility study would be an opportunity to reinvigorate an ERM programme and secure staff buy-in. Neither of the other two sites had a pre-existing ERM programme, although they both reported being very enthusiastic about the idea of commencing one.

Introducing PERMIT – (re)organising the work

Throughout the whole study period all three units experienced huge service demand, running significantly over capacity with reduced staffing. In addition, alongside the impact of COVID-19, there were unanticipated challenges or competing demands. At Site 1 this included the move of the whole PICU to a temporary location. The sites progressed through the first four phases at different paces (see Figure 15). Due to the prior history of an ERM programme, Site 1 progressed through initial phases quickly, with more time spent on Phase 3 – supporting staff engagement and training – and Phase 4 – adapting the manual and planning how to effectively deliver the ERM intervention and the trial at their site. Site 2, in contrast, spent more time on Phases 1 and 2. There was less focus on education and training and the specifics of where and how discussions about ERM took place, and more on the logistical factors associated with running the research study and capturing the data. Site 3 experienced a significant delay (9 weeks) in commencing the study, due to local site approval issues. This delay was not only frustrating for a site enthusiastic to start staff training and education, but also added pressure about the feasibility of recruiting 10 patients within an 11-week period. As a result, the site spent relatively little time in each of the phases, with the site starting to screen and recruit by week 16, only 1 week after Site 2 and only 3 weeks after Site 1.

To embed ERM, all sites realised – often more strongly in retrospect – the fundamental importance of ‘education, education, education! … I think that’s the key thing I think to try and make it work’ (Site One: Physio interview). Staff training and education were central to conveying information to all staff on the PICU, supporting them to understand the key principles of the ERM programme and build experience and confidence in delivering ERM. Ongoing education and teaching within formal contexts (e.g. organised study days), alongside informal, ad hoc moments (e.g. at bedside) and being ‘more opportunistic with teaching when clinical’ (Site Two: Debrief) were needed to support delivery of ERM. A refined, considered, educational strategy was introduced in Site 1:

Clear education plan, trainers are being trained and there is a training log planned to keep track of who has had what training.

This strategy focused on identifying what key information staff needed to understand, how many people needed training and a plan for how to train them.

There were challenges to providing the education and training sites that were felt to be required to achieve adequate staff commitment, confidence and skills. A core factor was the short trial period – 20 weeks from start to finish, less for Site 3, due to delays. At Site 2, someone commented that ‘the speed at which we had to put it in place and the speed at which we had to then recruit I don’t think gave us time to grow the roots enough’ (Site Two: ANP interview). At this site an additional challenge emerged, with educational resources having to be directed towards getting staff trained as quickly as possible on a new ventilator. Sites felt that the absence of any pre-prepared education and training materials accompanying the manual had been a challenge throughout the 5-month study period. As a result, Site 1 shared training material (which was then localised and rebranded) as well as access to a core trainer to support training and education at the other sites.

Delivering PERMIT – integrating early rehabilitation and mobilisation

Despite all the challenges associated with education and the speed with which the study was rolled out, PERMIT was seen by health professionals and parents as worthwhile (Table 26). All three sites reported positively about how the ERM programme cultivated multidisciplinary working, helped with clarification of roles and helped with elements about leadership and staff buy-in around ERM. MDT work was recognised as being central to delivering the desired level of ERM. This meant embracing multidisciplinary working to optimise service provision:

There are not enough hours in the day for a therapist to deliver the amount of ERM they’d like to be seeing going on. … It needs to become an MDT-based focus … everybody’s role. Therapists can’t be the only ones delivering this.

TABLE 26 The four constructs of NPT mapped against the three PERMIT study sites
NPT constructSite 1Site 2Site 3
Coherence: do people make sense of ERM?
Understanding of the purpose of ERMGood. Expanded beyond ‘movement’ to become more holisticUnclear within the study team. Unclear about wider PICU. Clear for parentsGood within site champions. Unclear about wider PICU. Clear for parents
Understanding of the roles of staff in relation to ERM deliveryDeveloped over the study. Some differences in views of what was ERM vs. ‘good nursing care’. Some concerns about professional boundaries emergedStaff clear about roles. Also, clear no capacity to do ‘extra’Staff clear about roles, but lack of engagement from nursing. Also, clear no capacity to do ‘extra’
Understanding of the study within clinical teamModerate, but supported by research teamLimited, but supported by research team where possibleUnclear, limited (research team) resources to support
Understanding of the study within parentsGenerally good on purpose and possible impactGenerally, on purpose and possible impactGenerally good on purpose and possible impact
Understanding of the impact of ERM on staff’s workGood, but felt already at capacityGood, but felt already at capacityGood, but felt already at capacity
Potential value and worth of ERM programmeGood and worthwhile. Staff some concerns about sustainability without additional resourcesGood and worthwhile. Staff concerned not possible to continue without additional resources once study ends.Potentially good and worthwhile. Champions aware not possible to continue without additional resources once study ends.
Cognitive participation: do people get involved with providing ERM and stay committed?
Were there key people driving ERM forward?Good leadership, MDT involvement and good attendance at debriefPhysio and research nurses predominantly. Debrief attendance minimalGood leadership from physio but limited other engagement. Debrief attendance minimal
Is ERM seen as a legitimate part of staff role?Yes: research teamYes: clinical nurses/physiosUncertainty for medical staff about exact roleYes: parentsYes: research team (funded)Yes: physiosUncertainty from some other staffYes: parentsNo: research team (none available)Yes: physiosUncertainty from some other staffYes: parents
Did staff get involved and incorporate ERM into practice?ERM rolled out to all patients as standard care. ERM delivery reported (mostly low level)Only patients recruited to PERMIT received ERM. Unclear extent ERM deliveredOnly patients recruited to PERMIT received ERM. Unclear extent ERM delivered
Are the team motivated to support ERM over time?Yes, but concerned as already experienced one failed attempt to embed an ERM programmeYes, but will not take a programme any further until further resources fundedYes, but recognise they need time and resources to re-launch a programme
Are parents motivated to support ERM over time?With support parents are willing and motivated to work with healthcare professionals to deliverWith support parents are willing and motivated to work with healthcare professionals to deliverWith support parents are willing and motivated to work with healthcare professionals to deliver
Collective action: do people make ERM work in practice?
Did participation with the study require additional staff training?Yes, underestimated. Tried initially to train all staff, then scaled backYes, targeted to staff caring for study participantsYes, targeted to staff caring for study participants
Was ERM operationalisable?YesUnclearYes
Ward round Change difficult, but ↑UnclearUnclear
Daily acuity assessment ↑ with timeUnclearUnclear
Activity selection ↑ with timeUnclearUnclear
Risk assessment ↑, but not fully conductedUnclear↑, but not fully conducted
Parental involvement Supported and encouragedSupported and encouragedSupported and encouraged
Trial-related documentation Completed by bedside staff and research nursesCompleted by research nurses. Bedside staff struggled with paper documentsCompleted by PI/champion – found very challenging. No research nurse support
Reflexive monitoring: do people evaluate ERM and PERMIT as worthwhile?
Was ERM evaluated as worthwhile?Yes: feel ERM shifted to being seen as part of routine care. Positive impact for child and familyYes: not sustainable without additional resources and nursing leadership. Positive impact for child and familyYes: considering innovative methods to sustain. Positive impact for child and family
Acceptability of PERMIT study data collection?Yes: because there was research nurse supportNo: too much burden on clinical staff because it did not integrate with IT systemNo: too much burden on PI/champion. No research nurse support
Acceptability of PERMIT outcome measurement tools for staff?Yes: number of questionnaires a concern but they were shortSome concerns: re time points and length for familiesYes: but fewer families consented (3/10)
Acceptability of PERMIT outcome measurement tools for parents?Yes: but not always perceived as relevant to their childYes: but not always perceived as relevant to their childYes: but not always perceived as relevant to their child
Overall acceptability of the study for staffGoodMixed – goodGood
Overall acceptability of the study for parentsGood: increased parents’ confidence, sense of purpose and satisfaction.Some saw direct benefit for child.Saw positive impact on staff behaviour and prioritisationGood: increased parents’ confidence, sense of purpose and satisfaction.Some saw direct benefit for child.Saw positive impact on staff behaviour and prioritisationGood: increased parents’ confidence, sense of purpose and satisfaction.Some saw direct benefit for child.Saw positive impact on staff behaviour and prioritisation
Is a future study viewed as worthwhile by staff?Yes: staff concerns reflect workload and resourcesYes: staff feel need to address nursing and medical leadership, workload and resourcesYes: staff feel need to address leadership, workload and resources
Is a future study viewed as worthwhile by parents?Yes: further research is importantYes: further research is importantYes: further research is important

In particular, the role of the bedside nurse was recognised as vital to support delivery. The challenge was about raising the profile of ERM as a priority in nurses’ daily work so ERM was no longer seen as just a desirable component, but an essential aspect of care provision. At moments, people struggled with whether to prioritise supporting colleagues:

Nursing staff report feeling guilty that they’re doing nice things with patients – play, music etc. when the rest of the staff are very busy and struggling with unit demands.

However, exposure to ERM over time, especially seeing ERM in action on a unit, could help in the process of it becoming embedded as ‘standard care’.

Exposure was, in part, challenging, however, because there were differences across sites to the extent that PERMIT was rolled out. At Site 1, ERM following the PERMIT manual – that is assessment of acuity, activity planning, risk assessments and family involvement – was regarded as the standard for all patients. At the other sites, only patients recruited to PERMIT received ERM as per the manual. Although there was variety in the use of the bedside bundle, there was recognition of the value to support ERM delivery and a shift in the traditional mind-set of a patient needing to be stable to be eligible to receive ERM. In practice, exposure emerged in a variety of ways, be that through strategies in place to promote staff buy-in and enhance involvement over time:

there’s posters going up, conversation in the coffee room taking place. Physio colleagues are more active in reminding clinicians at the bed space, or at least reminding the nurses to ask doctors doing the ward rounds … lots of general awareness that early rehab and mobilisation is actually important for the patients.

In and through taking part in PERMIT, staff exposure to ERM increased over the study period. Ward rounds also offered a space in which to undertake ERM discussions, at the very least in relation to whether a patient may be eligible for the study, as well identifying activities of rehabilitation for those recruited, if not for others outside PERMIT. Additionally, positive family feedback about involvement with ERM, when shared with staff, increased exposure and understanding of potential impact.

Over time, health professionals understood that ERM was important for the physical and psychological recovery of the CYP, as well as the psychological well-being of parents/carers supporting their involvement in their child’s care. For example, one site noted that:

Parents are engaged and involved, really keen on the ERM process. Parents are filling out the activity booklet and adding lots of detail. Seems to give them a focus and a process to be involved in.

All the sites reported that PERMIT has supported parental involvement. Feedback from parents was reported as ‘overwhelmingly positive and everyone’s saying how important it was within their journey’ (Site Three: Physio interview). All parents commented that there had been benefits to participating. This seemed to span from the emphasis the programme placed on parental involvement to the purpose that the programme provided. However, parental involvement in activity selection varied, with some referring to paperwork to help guide choices, while for others it appeared to be more led by the health-care professionals, whereas other parents reported not seeing a list or feeling actively involved in activity selection. Engagement in process was clearly enabling for parents:

It was quite nice to know, “Oh we can move onto the next stage” or you know, “Oh look there’s a new activity on the list, oh I hadn’t thought about doing that activity with him”. Or realising that sitting in the bed is a milestone almost. You know, it’s a new activity. As a parent you can see that as a milestone of their recovery.

Overall, most of the activities were undertaken while their child was ‘in bed’. The most commonly reported activities were cuddles, reading, singing, talking, touch or massage and stretches, which matched recorded activities completed by the bedside staff. The impression was that most parents felt the activities were tailored and appropriate for the stage the child was at.

Many parents reported feeling more confident in becoming involved in supporting ERM, that for them ‘I think it was so empowering’ (Site One: Parent interview). Parents reflected on how sick their child had seemed to them initially, but once they were familiar with what ERM involved and how they could be involved it gave them a sense of purpose:

But it also gives us something to do to feel useful because you’re in a situation where it’s one to one care. They know exactly what they’re doing, we’ve got no idea. We can’t help do anything in ICU, but you’re just looking at your child and you can’t do anything. But being able to have a structure as to what we can do to help, all of the activities that we could do … it meant that we could do something to actively help his recovery.

Parents perceived that being recruited to the study provided guidance to staff about activity assessment and selection and also encouraged them to consider the child holistically. They also felt more confident leaving their child to have a much-needed break because they trusted that staff would also follow the programme. Some saw a direct benefit to their child. Others were less sure or queried whether it was fully relevant to their child because they were an infant, but still saw the study as worthwhile. For many the main positive impact for their child was the contact the programme encouraged with parents. This spanned all aspects of care, particularly cuddles. Parents recognised how central they were to their child and their presence was therefore important to help support their child. However, outside the context of PICU delivery, support and guidance for delivering ERM were lacking. Several families reported that leaving PICU is only the first stage in recovery and more needed to be done to support them with ERM beyond PICU discharge.

Delivering PERMIT – integrating trial processes

Having access to research delivery support was central to supporting recruitment, data collection and data entry. This reduced demand on bedside staff as well as freeing up the site team for education and ERM delivery. Sites 1 and 2 worked with research nurses – with Site 1 having access to a clinical research nurse from Stage 4 – whereas at Site 3 did not. At Site 3 the lead champion took on all the workload associated with implementing the study and evaluating ERM delivery and they noted that:

The research side is very time consuming. The data collection and research collection are the biggest barrier to doing the ERM, the data collection, the consent process, the questionnaires – it’s all so time-consuming.

All three sites commented on the large volume of work associated with conducting the PERMIT study. A research team presence, ideally to cover all days and times of the week, was seen as essential. All parents also provided positive feedback about the role and presence of the research team during recruitment: their professionalism, the sensitivity with the timing of discussions and their ability to respond to questions.

Overall, the families were positive about the study recruitment process. Two parents referred to the challenge of written leaflets for parents with additional needs. As ERM was rendered as the ‘usual’ standard of care within the units – by the PIS and research team – many parents had low expectations about the potential risk of participation:

My main question was about if there was anything extra that was going to be done, anything invasive, and if it wasn’t then I didn’t see any reason why I wouldn’t consent to it.

For the majority the perception of ‘minimal’ to ‘no’ risk meant that they found this a relatively simple decision. The choice of a staged consent model was significantly influenced by other studies within the PICU environment66,102 and the PPIE work conducted within the PERMIT study (see Chapter 8). Of the 30 children recruited to the trial, 21 of the parents/legal guardians consented to participate in the ‘additional’ aspects of the PERMIT study (70% consent rate). Seven families (33%) consented in a staged approach, with 14 (67%) happy to consent to all parts in one go. Some parents felt signing up in stages had been really helpful for them, not overloading them at a difficult time. There was also a sense from some families that because ERM was standard practice on a PICU that an opt-out consent approach where families did not have to actively consent or could be asked at a later stage could be acceptable.

Introducing and embedding the study paperwork was challenging at times. This was only produced as physical documents and Site 2 did not have time or capacity to adapt it to their electronic patient management system, so

[h]aving the documentation all on paper created resistance from staff, they like everything to be done on the computer. This was perceived as a lot more work to have to do.

Easy access to documents at the bedside helped support and sustain study work. Sites also had some concerns about the outcome measurement tools provided to families, in part tied to the logistics of managing the process – with uncertainty about the time points required and the challenge of getting these completed. They also were uncertain about the volume of questionnaires to be provided to families. However, on the whole the questionnaires were viewed as acceptable by parents. Negative comments reflected that some questions were inappropriate for their child in terms of their ability to do the developmental outcomes (mostly for the parents of neonates), length and the slightly repetitive nature of some questions.

Embedding ERM post-PERMIT and PERMIT trial – (continuing) questions of capacity

As part of Phase 4 work, a debrief was held 2 months after the study had closed to recruitment. Despite huge enthusiasm about the potential for ERM to continue after PERMIT closed, all ERM activity related to the programme had stopped at Sites 2 and 3. However, at Site 1, even in the contexts of increased PICU workloads and COVID creating challenges for staffing, they still felt that ERM had shifted to being seen as part of routine care. They noted how ‘the research has increased frequency and awareness of ERM’ (Site One: Debrief), with most patients now having their acuity assessed daily and staff considering what ERM could be conducted, even if it was not always possible to undertake the planned activities. Bedside nurses appeared to have increased confidence in initiating and conducting ERM, with increased awareness of what each MDT member could contribute to ERM.

Core issues to embedding ERM after PERMIT remained, with Site 3 reflecting that

the challenges have taught us so much! … Need increased presence and visibility of an ICU specific therapy team to fully integrate into ICU. We learned also that therapy doesn’t need to be so structured and planned, we can do it in so many ways.

They felt they would ‘review, revamp and re-launch!’ with more time factored in for the programme to embed, and that the ‘minimum time to make this really embed would be 12 months’ (Site Three: Debrief). All three sites felt that additional resources were required to support (ongoing) staff education and training; that visibility, experience and (positive) feedback around multidisciplinary ERM working was key, as well nursing staff taking ownership being central to embedding.

The NoMAD survey results align with the way that sites, over time, began to realise the complexity of the work of introducing and embedding an ERM programme. Between time point one and two there was an increase in ERM familiarity through initial engagement, with a realisation that ERM was currently part of normal practice and would become part of normal practice (see Appendix 3, Figure 20). However, by the final and third survey the level decreased back to baseline.

A similar temporal pattern was seen in four NPT items: around questions of the legitimacy of ERM being a part of their role (Q15); being open to working with colleagues in new ways to use ERM (Q16); and notably, continuing to support ERM (Q17) and that sufficient resources are available to support ERM (Q23) (see Appendix 3, Figure 21). However, across all time points there was strong (and stable) agreement about seeing the potential value of ERM in their work (Q13) and strong (and stable) disagreement across all time points that ERM disrupts working relationship (Q19).

Summary of findings to inform PERMIT study

Although there were many challenges to implementation of the PERMIT intervention within the context of busy PICUs during a global pandemic, there was significant multidisciplinary input and support from parents/carers for ERM to be standardised within clinical practice. A future trial was therefore viewed as acceptable and we identified a number of recommendations for a future trial (Tables 27, 28 and 29). Key messages include:

  • Within a future trial, ERM needs to be embedded as standard routine practice for all CYP within the PICU. This would also enable an opt-out informed consent to be utilised and potentially reduce some of the challenges that parents outlined in relation to consent processes.
  • Research delivery support is vital to successfully complete the trial processes, but the research team cannot lead the implementation of a programme or it will not fully embed.
  • Bedside nurses are ideally placed to help deliver ERM but this workforce is already stretched. Currently ERM is not in their priorities and is seen as desirable, rather than essential. Adequately resourced PICU therapists will be required to support implementation and delivery.
  • There is no spare capacity to deliver ‘extra’ ERM within current resources.
  • ERM is seen as important for the physical and psychological recovery of the CYP, but is also important for the psychological well-being of parents/carers supporting their involvement in their child’s care.
  • Being involved with ERM is seen as hugely important for parents/carers. Further consideration of how we provide training and support for parents to facilitate this involvement is needed.
TABLE 27 Summary of recommendations about trial design for a future PERMIT trial
Source of informationDebriefStaff int.Parent int.Trial data
ERM ERM needs to be the standard of care on the unit for all CYP ✓✓✓
All staff need to be prepared and knowledgeable about planning and delivering ERM ✓✓✓
Population ERM can be delivered to a broad, diverse population of critically unwell or injured children ✓
Focusing resources to provide ERM to patients in PICU on day 3 and longer is acceptable ✓✓✓
Most PICU patients are on assisted respiratory support; use of duration of organ support may be a viable primary outcome for a future trial ✓
Parental consent If ERM becomes the standard of care then an opt-out consent model is acceptable ✓✓
Consent in the first few days of a PICU admission is possible, but challenging for parents ✓✓
If informed consent is required on a per patient basis then consider a staged approach to parents/legal guardians to reduce burden of decision-making ✓
Interviews with parents who consent to research is an acceptable additional request. Need to offer flexibility in their conduct ✓
Parent information Avoid making the PIS too long ✓
Consider additional methods to help share information – parent stories, short online (e.g. YouTube) videos ✓
Consider preparation and/or raising awareness for elective patients ✓
Study outcome measures Collect as few data as possible (including questionnaires) to minimise burden ✓✓✓✓
Appropriately fund research delivery time to provide support to facilitate completion and data entry ✓✓
Adapt method of data collection about ERM delivery to local site preference (and support integration of CRFs into electronic patient management systems where applicable) ✓✓✓
Provide clarity about the time points questionnaires (if required) need to be distributed ✓
Conduct questionnaires at as few time points as possible (as repetition challenging, time-consuming) ✓✓
Consider ways to facilitate completion for parents with additional needs ✓
TABLE 28 Summary of recommendations about trial ERM intervention and tools for a future PERMIT trial
Source of informationDebriefStaff int.Parent int.Trial data
ERM launch Sites need to provide clarity about study purpose, roles and expectations, differences from standard practice and clear messages about what the study will involve ✓✓
Use multiple methods to communicate and support launch – informal (bedside) and more formal (study days, training material) ✓✓
ERM staff education and training Sites must develop education strategy for all staff (identifying what training is required, to whom, by whom and to how many people) ✓✓
Need dedicated staff to support education and training roll out (centrally or locally provided) and ongoing support (locally provided) ✓
Training to include practical advice on how to conduct ERM (not just concepts of ERM) and variety of teaching methods (face to face, bedside, on-line) ✓
Study team need to provide sites with all education and training material and resources (which can be localised and branded) that are simple and easy to use as possible ✓✓
Acuity level closely associated with ERM delivery, dose and activity ✓
Acuity assessment Develop clear acuity-assessment tool (consider logo and identity concept) ✓✓✓
Consider visibility and accessibility of tool to staff and parents at bedside (parents like to see any progression) ✓✓✓
Refer to acuity tool in ward round and daily planning ✓✓
Champion and research team presence on ward round promotes acuity-tool use ✓✓✓
Activity-selection tool Accessible activity-selection tool for staff and parents to aid activity selection (enhances parental involvement) ✓✓✓✓
Encourage shared use of the tool ✓✓✓
Provide documentation of ‘ERM Prescription’ to support ERM delivery ✓✓✓✓
MDT help to select most appropriate patients ✓✓
Ease of access – tool available at the bedside ✓✓✓
Risk-assessment tools Provide guidance on documents to assess risk ✓
Clear guidance on safety and AEs to ensure accurate capture ✓✓
Pause and assess criteria can be used alongside AE reporting in ERM trials ✓
Delirium monitoring is essential in PICU; previously under-monitored and identification may improve care ✓
ERM delivery Provide guidance on the roles and responsibilities of all staff ✓✓
Consider definitions of ERM and provide guidance on the ERM interventions (where needed) ✓✓
The bedside nurse is vital to deliver ERM ✓✓✓✓
Additional funding for multidisciplinary staff time is required to support ERM delivery above current practice ✓✓✓✓
Additional funding for additional equipment to support ERM interventions (e.g. chairs) ✓✓✓
Consider parental involvement in ERM delivery ✓✓✓✓
Need to consider documentation/recording of activities to ensure captured, accurate dosing assessment (consider shared documentation staff and parents, especially duration of activity and level of intervention) ✓✓
TABLE 29 Summary of recommendations about trial monitoring and feedback for a future PERMIT trial
Source of informationDebriefStaff int.Parent int.Trial data
Safety Review any safety concerns/AEs in timely manner and address locally ✓✓✓
Sites need to have ongoing mechanism for local safety feedback and review, in addition to trial monitoring requirements ✓✓
Safety and AE reporting can align with pause and assess criteria within ERM intervention ✓
Staff feedback and comments Important to seek staff concerns and feedback about the trial ✓✓
Local site to consider methods for staff engagement and communication – newsletter, e-mails, social media use ✓
Need to address in timely manner or risk staff becoming disengaged ✓✓
CYP and parent/carer feedback Important to capture CYP/parent/carer feedback about their experience within the trial ✓✓
Sharing messages about trial participation with sites to increase the visibility of the study and to share positive messages ✓✓
← Phase 3: paediatric early rehabilitation and mobilisation during intensive care feasibility study – part 1 study feasibilityPhase 4: consensus and future recommendations →

Attribution. Barnaby R Scholefield; Julie C Menzies; Jennifer McAnuff; Jacqueline Y Thompson; Joseph C Manning; Richard G Feltbower et al. (2023). Implementing early rehabilitation and mobilisation for children in UK paediatric intensive care units: the PERMIT feasibility study. National Institute for Health and Care Research. Copyright © 2023 Scholefield et al. Licensed under CC BY 4.0. NCBI Bookshelf NBK597819. CC BY 4.0. Original source ↗. Text reproduced from the Bookshelf XML without changing wording; figures, images and supplements are not reproduced.

In this chapter Contents

  • Phase 3: paediatric early rehabilitation and mobilisation during intensive care feasibility study – part 2 process evaluation

Source

OpenStax source file ↗

Source record ↗

EvidenceLib is a research-education resource, not medical advice. It does not diagnose, prescribe or recommend starting, stopping or changing any treatment. Talk to a qualified clinician about your own situation. Methods, sources and licences · Rights and removal requests · Legal · Support