Skip to content
EvidenceHelixEvidenceLib · Scientific Encyclopedia
⌘ K

Scientific library

EvidenceLib encyclopediaAll articles A–Z2,835Open textbooks209Open-access articles1,406Cancer study catalog458How it is made

My workspace this browser

Saved pages0Notes & annotations0

Recently viewed

Explore by field

Cancer and Oncology182Genetics and Genomics170Neuroscience185Cardiovascular Medicine180Immunology142Pharmacology173Molecular Biology161Infectious Diseases150Rare and Inherited Diseases181Clinical Research173Anatomy and Physiology613Drugs and Chemicals621Psychiatry and Psychology185Public Health and Nutrition178Diagnostics and Medical Technology125Respiratory Medicine113Digestive System and Liver91Metabolism and Endocrine Disease177Bones, Joints, Muscles and Skin213Kidney, Urology and Women's Health173Eye, Ear, Nose and Throat55
Plans & pricingCompare EvidenceHelix workspace plans
Library›Open textbooks›Plaster cast versus functional bracing for Achilles tendon rupture: the UKSTAR RCT›Health economics

Continue where you left off ()

Explore more with EvidenceHelix Workspace

Compare studies, analyze evidence and create research reports with premium tools.

Explore Researcher plans

Plaster cast versus functional bracing for Achilles tendon rupture: the UKSTAR RCT · Health economics

Health economics

CC BY 4.0 · NIHR Journals Library · approximately 12 min read

This section presents the results of the health economic analyses comparing plaster cast with functional brace. We compare (1) missing data by treatment group; (2) resource use and economic costs for different health and social care categories; (3) distribution of the responses to the EQ-5D-5L questionnaires and the EQ-5D-5L utility scores; and (4) cost-effectiveness results of the base-case and sensitivity analyses.

Results of economic analysis

Table 20 shows the degree of missing health economic data by treatment group and follow-up time point. The missing data pattern is non-monotonic, as individuals with missing data at one follow-up time point could return to the trial subsequently. For example, there are more missing EQ-5D data at 6 months than at 9 months post injury. A similar pattern can be observed for economic costs. It is worth noting that the smaller number of participants with complete data for the entire duration of follow-up (baseline to 9 months post injury) was because of a strict application of the term missing (i.e. we considered a participant as having incomplete data if, for example, they responded positively to vising a GP surgery at 3 months but did not specify the number of consultations, despite all other resource use items being completed). However, for the cost-effectiveness analysis, imputation was not at the aggregate level, such that most of the data used for the analysis were based on actual participant responses.

TABLE 20 Number and proportion of individuals with missing health economic data by treatment group
VariableDescriptionTreatment group, missing values, n (%)Total, missing values, n (%)
Plaster cast (N = 266)Functional brace (N = 274)
eq5dbEQ-5D index score pre injury2 (0.75)2 (0.73)4 (0.74)
eq5d0EQ-5D index score post injury2 (0.75)1 (0.36)3 (0.56)
eq5d1EQ-5D at 8 weeks32 (12.06)33 (12.04)65 (12.04)
eq5d2EQ-5D at 3 months37 (13.91)29 (10.58)66 (12.22)
eq5d3EQ-5D at 6 months42 (15.79)37 (13.5)79 (14.63)
eq5d4EQ-5D at 9 months22 (26)15 (5.47)37 (8.27)
QALYQALYs generated from EQ-5D utility scores76 (28.57)74 (27.01)149 (27.78)
c0Total resource use between baseline and 8 weeks post injury66 (24.8)59 (21.53)125 (23.15)
c1Total resource use between 8 weeks and 3 months post injury59 (22.18)47 (17.15)106 (19.63)
c2Total resource use between 3 and 6 months post injury56 (21.05)48 (8.89)104 (19.26)
c3Total resource use between 6 and 9 months post injury31 (11.65)18 (6.57)49 (9.07)
c4Total resource use between baseline and 9 months post injury132 (49.62)116 (42.34)248 (45.93)

Health and social care resource use

Table 25 (see Appendix 1) shows the resource use values for participants by treatment group, resource use category and follow-up period for complete cases. The values are presented for subcategories of resource use, including hospital inpatient and outpatient care, community health and social care, prescribed medications, equipment and aids, and productivity losses.

In terms of specific resource use at the 8-week follow-up (see Appendix 1, Table 25), notable differences were observed between the groups for the proportion prescribed anticoagulant as VTE prophylaxis treatment (0.72 vs. 0.59; p = 0.003), the mean number of NHS outpatient orthopaedic visits (2.63 vs. 1.80; p < 0.001), the mean number of NHS outpatient physiotherapy visits (0.23 vs. 0.46; p = 0.003), the mean number of GP surgery visits (0.10 vs. 0.19; p = 0.028) and the mean number of grab rail installations (0.05 vs. 0; p = 0.019). For all other resource use items, there were no noticeable differences between the groups.

Between 8 weeks and 3 months post injury (see Appendix 1, Table 25), there were differences in resource use between the groups for the proportion of participants prescribed analgesics (0.11 vs. 0.05; p = 0.015) and the proportion of participants prescribed other medications (0.02 vs. 0; p = 0.038). For all other resource use items, there were no noticeable differences between the groups.

There were no significant differences in resource use between the plaster cast and the functional brace groups at 6 or 9 months post injury.

Economic costs

Table 21 summarises the total NHS and PSS costs associated with resource use during the trial period among complete cases by cost category and by follow-up period. The mean direct intervention cost was £35.71 for the plaster cast group compared with £108.64 for the functional brace group; the mean difference of £72.93 was statistically significant at the 5% level. The mean total NHS and PSS costs were significantly lower in the functional brace group between randomisation and 8 weeks post injury and between 8 weeks and 3 months post injury, with mean between-group cost differences of £107.73 and £92.95, respectively. The mean total NHS and PSS cost during the entire follow-up period was £1182.64 for the plaster cast group and £1018.26 for the functional brace group; the mean between-group cost difference of £164.39 was not statistically significant at the 5% level. Figure 14 (see Appendix 1) shows the distribution of total NHS and PSS costs during the entire follow-up period and indicates that differences in measures of central tendency (i.e. mean, median) for total economic costs between the treatment groups were not driven by high costs generated by a small number of participants in the trial.

TABLE 21 The NHS and PSS costs for participants with complete resource use data by treatment group, study period and cost category (2017–18 prices)
Cost category by periodTreatment group, mean (SE) cost (£)Mean differencep-valueaBootstrap 95% CIb
Plaster castFunctional brace
Baseline to 8 weeks post injury: direct intervention costsc (total, N = 497: plaster cast, n = 241; functional brace, n = 256)
 Total direct intervention costs35.71 (0.492)108.64 (3.114)–72.93< 0.0001–79.22 to –66.64
Baseline to 8 weeks post injury: NHS PSS resource use (total, N = 432: plaster cast, n = 210; functional brace, n = 222)
 Inpatient care55.8 (28.382)39.3 (22.163)16.510.647–53.48 to 86.49
 Outpatient care370.2 (15.114)282.6 (15.078)87.59< 0.000145.97 to 129.21
 Community care9.66 (2.521)28.94 (14.493)–19.280.191–47.64 to 9.07
 Medications151.35 (9.334)106.45 (8.701)44.9< 0.00120.34 to 69
 Aids and adaptations9.51 (0.842)7.32 (0.568)2.190.0320.20 to 4.19
 PSS0.15 (0.151)0 (0)0.150.318–0.14 to 0.45
 Total NHS and PSS cost596.67 (36.596)464.61 (32.946)132.060.00833.35 to 230.78
 Total costs during first 8 weeks (including direct intervention costs)d647.88 (37.99)540.15 (26.10)107.730.0216.15 to 199.31
8 weeks to 3 months post injury (total, N = 434: plaster cast, n = 207; functional brace, n = 227)
 Inpatient care61.69 (27.278)4.74 (4.74)56.950.0414.33 to 109.57
 Outpatient care118.74 (9.948)98.76 (7.608)19.980.111–5.07 to 45.03
 Community care31.96 (15.86)19.89 (4.77)12.070.33920.69 to 44.83
 Medications5.95 (3.359)2.86 (2.133)3.10.437–4.56 to 10.75
 Aids and adaptations1.65 (0.359)0.75 (0.261)0.90.0440.014 to 1.78
 PSS0 (0)0.04 (0.04)–0.040.318–0.12 to 0.039
 Total NHS and PSS cost220.00 (36.662)127.04 (12.333)92.950.01714.80 to 171.11
3–6 months post injury (total, N = 436: plaster cast, n = 210; functional brace, n = 226)
 Inpatient care21.08 (16.736)43.94 (22.392)–22.860.414–80.61 to 34.90
 Outpatient care128.56 (11.731)142.56 (13.215)–140.429–47.66 to 19.67
 Community care33.56 (2.617)27.75 (5.679)5.8120.376–19.98 to 31.60
 Medications0 (0)1.51 (1.015)–1.510.138–3.56 to 0.54
 Aids and adaptations1.02 (0.472)1.03 (0.534)–0.010.989–1.38 to 1.36
 PSS0.49 (0.491)0 (0)0.490.318–0.42 to 1.40
 Total NHS and PSS cost184.70 (26.350)216.78 (29.988)–32.070.422–108.74 to 44.58
6–9 months post injury (total, N = 491: plaster cast, n = 235; functional brace, n = 256)
 Inpatient care5.94 (4.771)45.45 (45.45)–39.510.388–133.06 to 54.05
 Outpatient care76.44 (22.253)65.98 (9.884)10.460.668–39.34 to 60.26
 Community care14.03 (4.022)17.302 (7.197)–3.270.691–19.78 to 13.24
 Medications0.33 (0.228)0.13 (0.058)0.20.396–0.26 to 0.66
 Aids and adaptations0.36 (0.217)0.08 (0.052)0.280.214–0.15 to 0.71
 PSS0.11 (0.11)0 (0)0.110.318–0.10 to 0.32
 Total NHS and PSS cost97.21 (23.666)128.94 (46.80)–31.730.543–127.40 to 63.94
0–9 months post injury (total, N = 292: plaster cast, n = 134; functional brace, n = 158)
 Total direct intervention costs35.96 (0.646)106.46 (4.08)–70.5–78.30 to –62.69
 Inpatient care162.29 (85.042)45.43 (24.373)116.860.188–62.66 to 296.38
 Outpatient care722.78 (39.326)653.42 (40.288)69.360.219–38.61 to 177.33
 Community care103.22 (33.32)91.18 (22.809)12.040.766–67.72 to 91.80
 Medications146.41 (11.364)112.61 (10.884)33.80.033–2.66 to 64.94
 Aids and adaptations11.75 (1.331)9.16 (1.127)2.590.139–0.71 to 5.88
 PSS0.24 (0.236)0 (0)0.240.319–0.22 to 0.70
 Total NHS and PSS costs during first 9 months1182.64 (114.696)1018.26 (58.143)164.390.203–95.75 to 424.52

Health outcomes

Summary results of the EQ-5D-5L analysis are presented in detail Chapter 3, Analyses to address secondary outcomes and Ancillary analyses. Below we provide the cost-effectiveness results.

Cost-effectiveness results

The cost-effectiveness results are presented in Table 22, with plaster cast as the referent and functional brace as the comparator (i.e. functional brace minus plaster cast) for the estimation of ICER values. The analytic time horizon is the entire 9-month post-injury follow-up period of the trial. The joint distribution of costs and outcomes for the base-case analysis and sensitivity analyses is represented in Figures 6–13.

TABLE 22 Cost-effectiveness: cost per QALY (2017 prices) – functional brace compared with plaster cast
ScenarioTreatment group, mean (SE) cost (£)Incremental cost (95% CI)Treatment group, mean (SE) QALYIncremental QALYs (95% CI)ICERa (£)Probability that functional brace is cost-effectiveNMBs
Functional bracePlaster castFunctional bracePlaster castp-valuebp-valuecp-valuedNMBe (95% CI)NMBf (95% CI)NMBg (95% CI)
Base-case analysis
Imputed attributable costs and QALYs; covariate adjusted1078.16 (83.42)1180.72 (89.63)–102.56 (–289.28 to 84.16)0.506 (0.0064)0.492 (0.0066)0.015 (–0.0013 to 0.030)Dominant0.9630.9650.966312.28 (–31.26 to 655)383.82 (–32.67 to 793.80)526.90 (–42.50 to 1076.87)
Sensitivity analyses
Complete-case attributable costs and QALYs; covariate adjusted948.77 (53.91)1117.28 (110.66)–168.51 (–458.01 to 32.88)0.513 (0.00642)0.497 (0.0064)0.017 (–0.0035 to 0.037)Dominant0.9760.9760.972443.54 (19.83 to 933.22)527.26 (9.11 to 1094.07)694.70 (–17.56 to 1406.23)
Societal perspective4362.15 (348.71)4114.54 (292.18)247.61 (–476.44 to 971.66)0.506 (0.0063)0.502 (0.007)0.015 (–0.0042 to 0.031)16,5100.5010.5760.688–29.65 (–991.50 to 874.93)44.36 (–964.19 to 991.46)192.39 (–926.97 to 1244.53)
CACE population1038.6 (62.89)1169.44 (78.48)–130.84 (–335.38 to 90.36)0.510 (0.00609)0.488 (0.00688)0.022 (0.0051 to 0.038)Dominant0.9920.9930.99444.52 (89.86 to 852.63)57.36 (127.50 to 1030.39)818.02 (199.26 to 1434.03)
Secondary cost-effectiveness analysis using ATRSh as outcome measure1057.22 (71.91)1149.44 (79.25)–92.21 (–273.86 to 89.44)45.09 (0.72)44.30 (0.73)0.78 (–1.12 to 2.69)Dominant0.8750.8390.822174.03 (–117.37 to 463.44)328.84 (–306 to 970.91)406.25 (–403.75 to 1218.76)

FIGURE 6 Cost-effectiveness scatterplot at 9 months for base-case analysis (NHS and PSS perspective, imputed, additionally controlled for pre-injury utility, ITT analysis). Reproduced from Costa et al.49 © 2020 The Author(s). Published by Elsevier Ltd. This is an Open Access article distributed in accordance with the terms of the Creative Commons Attribution (CC BY 4.0) license, which permits others to distribute, remix, adapt and build upon this work, for commercial use, provided the original work is properly cited. See: http://creativecommons.org/licenses/by/4.0/. (Figure not reproduced here; see the original article.)

FIGURE 7 Cost-effectiveness acceptability curve at 9 months for base-case analysis (NHS and PSS perspective, imputed, additionally controlled for pre-injury utility, ITT analysis). Reproduced from Costa et al.49 © 2020 The Author(s). Published by Elsevier Ltd. This is an Open Access article distributed in accordance with the terms of the Creative Commons Attribution (CC BY 4.0) license, which permits others to distribute, remix, adapt and build upon this work, for commercial use, provided the original work is properly cited. See: http://creativecommons.org/licenses/by/4.0/. (Figure not reproduced here; see the original article.)

FIGURE 8 Cost-effectiveness scatterplot at 9 months for complete cases (NHS and PSS perspective, ITT analysis). (Figure not reproduced here; see the original article.)

FIGURE 9 Cost-effectiveness acceptability curve for complete cases (NHS and PSS perspective, ITT analysis). (Figure not reproduced here; see the original article.)

FIGURE 10 Cost-effectiveness scatterplot for societal perspective (imputed, ITT analysis). (Figure not reproduced here; see the original article.)

FIGURE 11 Cost-effectiveness acceptability curve for societal perspective (imputed, ITT analysis). (Figure not reproduced here; see the original article.)

FIGURE 12 Cost-effectiveness scatterplot for CACE population (imputed, NHS and PSS perspective). (Figure not reproduced here; see the original article.)

FIGURE 13 Cost-effectiveness acceptability curve for CACE population (imputed, NHS and PSS perspective, covariate adjusted). (Figure not reproduced here; see the original article.)

Base-case analysis

Patients in the functional brace group experienced a non-statistically significant increase in QALYs in the base case (0.015 QALYs, 95% CI –0.0013 to 0.030 QALYs) over the 9-month follow-up period. In addition, mean NHS and PSS costs were lower in the functional brace group (mean cost difference –£103, 95% CI –£289 to £84). The ICER for the base-case analysis indicates that functional brace is the dominant procedure, as average costs for this intervention were lower and average benefits were greater than those for plaster cast.

Assuming cost-effectiveness thresholds of £15,000 per QALY, £20,000 per QALY and £30,000 per QALY, respectively, the probability that functional brace was cost-effective ranged from 0.96 to 0.97, and the NMB associated with functional brace was positive (see Table 22).

Sensitivity analyses

Comparing mean costs and QALY estimates using different analytical scenarios (complete case, societal perspective and CACE population) revealed that the cost-effectiveness results generally supported the base-case finding, with the exception of the sensitivity analysis that adopted a societal perspective. From the societal perspective, mean costs were higher in the functional brace group (£248, 94% CI –£476 to £972). However, the QALY results followed the same pattern as that for the base-case analysis and indicated that participants in the functional brace group experienced a non-statistically significant increase in QALYs over the 9-month follow-up period (0.015 QALYs, 95% CI –0.0042 to 0.031 QALYs). The probability that functional brace was cost-effective declined to a range of 0.50–0.69 at cost-effectiveness thresholds of £15,000 per QALY, £20,000 per QALY and £30,000 per QALY. The results of the mixed-effects model followed a similar pattern to those of the base-case (imputed) model: patients in the functional brace group experienced a non-statistically significant increase in QALYs (0.014 QALYs, 95% CI –0.0018 to 0.031 QALYs) over the 9-month follow-up period. In addition, mean NHS and PSS costs were lower in the functional brace group (mean cost difference –£135, 95% CI –£342 to £71).

The results of the sensitivity analyses to the MAR assumption, presented in Appendix 1, indicate that the cost-effectiveness of functional brace remained stable across all of the MAR departure scenarios. In addition, Figure 17 shows that a change in cost-effectiveness decision is likely to occur if participants with missing HRQoL data have up to 50% lower HRQoL than trial participants with similar characteristics whose HRQoL data are available.

Long-term economic modelling

The protocol allowed for decision-analytic modelling to estimate the longer-term cost-effectiveness of functional brace or plaster cast. However, we note that cost and health utility values started to converge from the 3-month follow-up time point and converged at subsequent time points, even though functional brace was cost-effective over the entire follow-up period. It was therefore concluded that longer-term extrapolation of cost-effectiveness of functional brace is highly unlikely to be meaningful. Furthermore, we did not identify external studies that compared differences in economic costs, functional outcomes or HRQoL beyond 9 months post injury between non-surgical patients treated with plaster cast and those treated with functional brace. This lack of the data needed to parameterise a model further challenged any efforts to conduct longer-term decision modelling.

← Clinical trial resultsDiscussion →

Attribution. Matthew L Costa; Juul Achten; Susan Wagland; Ioana R Marian; Mandy Maredza; Michael Maia Schlüssel et al. (2020). Plaster cast versus functional bracing for Achilles tendon rupture: the UKSTAR RCT. NIHR Journals Library. Copyright © Queen’s Printer and Controller of HMSO 2020. This work was produced by Costa et al. under the terms of a commissioning contract issued by the Secretary of State for Health and Social Care. This issue may be freely reproduced for the purposes of private research and study and extracts (or indeed, the full report) may be included in professional journals provided that suitable acknowledgement is made and the reproduction is not associated with any form of advertising. Applications for commercial reproduction should be addressed to: NIHR Journals Library, National Institute for Health Research, Evaluation, Trials and Studies Coordinating Centre, Alpha House, University of Southampton Science Park, Southampton SO16 7NS, UK. Licensed under CC BY 4.0. NCBI Bookshelf NBK553707. CC BY 4.0. Original source ↗. Text reproduced from the Bookshelf XML without changing wording; figures, images and supplements are not reproduced.

In this chapter Contents

  • Health economics

Source

OpenStax source file ↗

Source record ↗

EvidenceLib is a research-education resource, not medical advice. It does not diagnose, prescribe or recommend starting, stopping or changing any treatment. Talk to a qualified clinician about your own situation. Methods, sources and licences · Rights and removal requests · Legal · Support